General Information

Basic details about the project and hazard identification.

Severity Determination

Calculate severity based on impact criteria.

--
--
=

Table S1: Impact Calculation

SN Impact Area Score (0-5) Impact Level Weight Weighted Score
Total Weighted Score: 0

Table S2: Impact Level Guide

Level Score
Very High 5
High 4
Moderate 3
Low 2
Negligible 1
Nil 0

Table S3: Severity Matrix

Score Range Sev. Category
52 - 65 A Catastrophic
39 - 51 B Hazardous
26 - 38 C Major
13 - 25 D Minor
01 - 12 E Negligible

Determination of Probability

Barrier quality, Strength value and robustness

--
--
--
--
--

Table 0: Probability Table

Type of Barrier Total BSV Probability
Existing 0 --
Resultant (Existing + New) 0 --

Table P1: Existing Barriers

SN Barrier Effectiveness (3) Cost Benefit (1) Practicality (1) Acceptability (1) Enforceability (1) Durability (1) Disinclination (2) Total BQV Corr. BSV Robustness Remarks (Prev/Rec) Include
Total BSV (Existing): 0

Table P2: New / Future Barriers

SN Barrier Effectiveness (3) Cost Benefit (1) Practicality (1) Acceptability (1) Enforceability (1) Durability (1) Disinclination (2) Total BQV Corr. BSV Robustness Remarks (Prev/Rec) Include
Total BSV (New): 0

Reference Tables

Table P3: Barrier Strength Value (BSV)

Total BQV BSV (Correlated)
0 - 90
10 - 171
18 - 252
26 - 333
34 - 414
42 - 505

Table P4: Robustness

BSV Robustness
0Poor
1Poor
2Fair
3Good
4Very Good
5Excellent

Probability Determination (Optimum CBSV-Likelihood Correlation)

Severity A
RangeValDesc
0-75Certain
8-154Likely
16-233Possible
24-312Unlikely
32-401Exc. Imp
Severity B
RangeValDesc
0-55Certain
6-114Likely
12-173Possible
18-232Unlikely
24-301Exc. Imp
Severity C
RangeValDesc
0-35Certain
4-74Likely
8-113Possible
12-152Unlikely
16-201Exc. Imp
Severity D
RangeValDesc
0-25Certain
3-54Likely
6-83Possible
9-112Unlikely
12-151Exc. Imp
Severity E
RangeValDesc
0-15Certain
2-34Likely
4-53Possible
6-72Unlikely
8-101Exc. Imp

Risk Matrix

Composite Risk Index & Tolerability

--
--
--
--
--
--

Risk Calculation Summary

Current Risk Resultant Risk
Existing Preventive Control / Barriers New Preventive Control / Barriers (NCB)
Barrier BSV Barrier BSV Action by whom and when
Total BSV 0 Total BSV (New) 0
Grand Total BSV 0
Risk Probability -- Risk Probability --
Risk Severity -- Risk Severity --
Risk Index -- Risk Index --
Risk Tolerability -- Risk Tolerability --

Acceptance of Risk

All the required processes of Safety Risk Management have been duly followed and the resultant risk is accepted.

Department Head (All the risk assessment and mitigation processes have been duly followed and the resultant risk is acceptable)
Name:
Signature:
Director General (The resultant risk is acceptable)
Name:
Signature:

Risk Matrix (Severity vs Probability)

5
Certain
4
Likely
3
Possible
2
Unlikely
1
Exceptional
A - Catastrophic
5A
4A
3A
2A
1A
B - Hazardous
5B
4B
3B
2B
1B
C - Major
5C
4C
3C
2C
1C
D - Minor
5D
4D
3D
2D
1D
E - Negligible
5E
4E
3E
2E
1E

Safety Risk Tolerability Matrix

Tolerability Description Assessed Risk Index Suggested Criteria
Intolerable Region 5A, 5B, 5C, 4A, 4B, 3A Unacceptable under the existing circumstances.
Tolerable Region 5D, 5E, 4C, 4D, 4E, 3B, 3C, 3D, 2A, 2B, 2C, 1A Acceptable based on risk mitigation. It may require management decision.
Acceptable Region 3E, 2D, 2E, 1B, 1C, 1D, 1E Acceptable

Barrier Register

Tracking and Implementation Plan

1. Existing Preventive Controls/Barriers

S.No. Barrier Description Hazard No. SRM Date Barrier Strength Implementation Status Action by whom and when Follow-up date

2. Existing Recovery Controls/Barriers

S.No. Barrier Description Hazard No. SRM Date Barrier Strength Implementation Status Action by whom and when Follow-up date

3. New Preventive Controls/Barriers

S.No. Barrier Description Hazard No. SRM Date Barrier Strength Implementation Status Action by whom and when Follow-up date

4. New Recovery Controls/Barriers

S.No. Barrier Description Hazard No. SRM Date Barrier Strength Implementation Status Action by whom and when Follow-up date

Risk Register

Assessment Summary & Risk Reduction

Hz. code SRM Date Description of Hazard Consequence(s) Existing Risk Resultant Risk Status Follow up
Severity Probability Risk Index Risk Tolerability Severity Probability Risk Index Risk Tolerability Open Close/date

User Instruction Manual

Professional Safety Risk Assessment (SRA) Tool - Version 1.0.0

1. Overview

The SRA Tool is a professional-grade application designed to facilitate the systematic identification, assessment, and mitigation of safety hazards. It follows standard aviation and industrial safety protocols to ensure rigorous risk management.

2. Phase 1: Hazard Identification

Go to the General tab and enter the key identifiers for your assessment:

  • Hazard ID: A unique identifier (e.g., HZ-001).
  • Hazard Name: A concise description of the safety concern.

3. Phase 2: Severity Assessment

Navigate to the Severity tab to evaluate the potential impact of the hazard.

  • Evaluate the hazard across 7 impact areas including Public Safety, Worker Safety, and Asset Damage.
  • Assign a score (0-5) for each area. The tool will automatically calculate the Severity Level (A-E).

4. Phase 3: Probability & Barrier Management

This phase determines the likelihood of hazard occurrence based on your control measures (Barriers).

Barrier Definition (Table P1 & P2)

  • Table P1: List your Existing controls.
  • Table P2: Propose New/Future controls to further reduce risk.
Scoring Barriers: Score each barrier (0-5) across 7 criteria like Effectiveness and Practicality. The tool calculates a Barrier Strength Value (BSV) for each.

Inclusion Logic

Set Include to "Yes" for barriers that should contribute to the risk reduction. Only included barriers affect the final Probability calculation.

5. Phase 4: Risk Matrix & Tolerability

Visit the Risk Matrix tab to see the final assessment result.

  • Composite Risk Index: A combination of Probability and Severity (e.g., 5A, 3C).
  • Tolerability: View the color-coded status (Red: Intolerable, Yellow: Tolerable, Green: Acceptable).
  • Risk Calculation Summary: A consolidated table showing exactly which barriers were included and their impact on the final score.

6. Phase 5: Implementation & Tracking

Use the Barrier Register and Risk Register tabs to turn assessment into action.

  • Sync: Use the "Sync" buttons to populate the registers with your current assessment data.
  • Tracking: Update implementation status, assign responsibilities, and set follow-up dates directly in the tables.

7. Software Utilities

  • Save/Load: Export your entire project as a .sra file to continue work later.
  • DOCX Export: Generate a professional, color-coded Word document of your full assessment.
  • Bow Tie Diagram: Access the external Bow Tie tool for advanced visual hazard analysis.
  • Sample Data: Use "Fill Sample Data" to quickly see how the tool functions.